Test Case 18

Evaluation of various service definitions and activation patterns

Identification

ID

18

Author

Christoph Bauschmann, Matti Aro, Petra Raussi

Version

1

Project

ERIGrid 2.0

Date

19/4/2021

Test Case Definition

Name of the Test Case

Evaluation of various service definitions and activation patterns

Narrative

Aggregation can serve the representation and coordinated operation with respect to energy markets. Cyber-physical interactions appear especially in congestion management, where aggregators may trade as well as in the facilitation and match-making in a Local Energy Community (LEC).

A peer-to-peer trading platform for energy community management leads to an implicit energy dispatch that is traced by the community manager. Prior to participation in a Virtual Power Plant (VPP) formed by distributed aggregations, the provided ancillary services undergo pre-qualification tests to their communication and flexibility characterization aspects.

This test case concerns the evaluation of the services required for and offered by an aggregation platform, as well as their connected activation patterns. The test scenarios serve the validation of continuous service provision under various disruptions and system settings.

The two scales of the power system considered here are MV/LV distribution networks and single LV distribution feeders, both with various loads, renewable generation, demand side flexibility, such as EV charging infrastructure, and other DERs.

Function(s) under Investigation (FuI)

Aggregator services providing stability and flexibility to the network

Object under Investigation (OuI)

Activations patterns, services, impacts to power grid

Domain under Investigation (DuI)
  • Electrical power system
  • Control/ICT
Purpose of Investigation (PoI)
  • PoI#1: Evaluate system services and connected activation patterns of an aggregator platform (e.g., fast frequency response, Fault Ride Through, blackstart assistance, coordinated voltage control, virtual inertia provision)
  • PoI#2: Evaluate continuous service provision under disruptions and addressment of irregularities (e.g., congestion, loss of a line/generator, errors in forecast/measurement)
  • PoI#3: Determine/validate pre-qualification factors for ancillary services
System under Test (SuT)
  • Distribution system (lines, transformers, etc.): power distribution network (MV/LV) / LV distribution feeder
  • Local energy community (LEC): flexible loads (domestic), inflexible loads (e.g., ships), DERs (e.g., PV, wind turbine, energy storage system)
  • Aggregation platform / VPP: energy sharing coordinator (control system), communication systems, measuring and monitoring devices
Functions under Test (FuT)

In-focus functions: Aggregator platform services

Emulated functions: Controlling functions of the systems (e.g., aggregator network management control methods, DER controlling, storage system controlling)

Actuation functions: Controllable loads, demand response signals

Observer functions: Monitoring of network properties (e.g., voltage, current, uncontrollable load)

Test criteria (TCR)
  • Safe and robust voltage for all nodes
  • Transient and frequency stability
  • Fulfillment (in real-time) of the scheduled power profile in presence of disruptions/errors
  • Effectiveness of ancillary service activation patterns
  • Scalability of aggregation and control solutions
  • Communication functionality for aggregation, service matching, fail-over, configuration, and interoperability
Target Metrics (TM)
  • Voltage/frequency regulation regions: [image]
  • Short fulfillment time
  • Optimal dispatch of flexibilities
Variability Attributes (VA)
  • Congestion (load)
  • Loss of a line/generator
  • Errors in forecast/measurement
  • Medium-voltage variations
  • Participating DERs (number & type)
  • Concurrent services (interference/synergy)
Quality Attributes (QA)
  • Power quality standard EN50160
  • All node voltages within the specified limit (+ or -10%)
  • Quick fault reduction

Qualification Strategy

PoI#1 is met with TS 18.01 and PoI#2 is met with TS 18.02. PoI#3 does not have a separate TS as it falls under the TC19 pre-qualification concepts.


Test Specification 18.01

Evaluation of system services and activation patterns after functional disruption in the local grid

Test Specification 18.02

Evaluating the provision of regulatory aggregator services under irregularities after network disruptions or errors in forecast/measurement