Use case identification
ID | Area /Domain(s)/Zone(s) | Name of the Use Case |
---|---|---|
UC-GR-5 | Area: Energy systemDomains: Distribution/Zone: Station,Operation | PMU integration and Data Visualization for Flexibility Services Management |
Notes:
ID - unique identification label: DE-1/GR-3/IT-2
Area /Domain(s)/Zone(s) - placement of the use case in the SGAM domains and zones. It can be left blank if you are not sure.
Version management
Version No. | Date | Name of author(s) | Changes | Approval status |
---|---|---|---|---|
0.1 | 17th June 2020 | Dimitris Stratogiannis, Panagiotis Pediaditis, Stavroula Tzioka, Eleni Daridou, Themistoklis Xygkis | Initial creation | Draft |
Scope and objectives of use case
Scope | The scope of the UC is to examine the integration and operational use of low cost PMUs in order to increase network observability collecting measurement data such as voltage, current and phases in various points of the distribution network. More in detail, the DSO will use the data collected to improve the operation of the tools and services developed within the project by exploiting increased data granularity. Furthermore, the data coming from various sources and systems of the DSO should be integrated in the DSO Technical Platform having first passed through the Blockchain Access Platform developed in the project to provide data access security and data integrity. In addition, all the available data should be further delivered for use by tools and services developed in order to support flexibility mechanisms. All the appropriate communication protocols should be integrated and tested to develop a unique point of data delivery to various actors involved in the project and a User Interface (UI) should be developed to allow the DSO personnel to use the available tools and services. |
Objective(s) | * To increase network observability. * To integrate data coming from different sources in the DSO Technical Platform. |
Related business case(s) | add text |
Notes:
Short description PMUs are installed in critical network nodes to increase network observability. PMU measurements along with other DSO data (network topology, customer loads, etc) are integrated in the DSO Technical Platform to be visulalised in a User Interface (UI), so that DSO can make use of tools and services developed in the project. Aforementioned data is going through the Blockchain Access Platform developed in the project to ensure data access security and data integrity.
Complete description
The DSO operates the distribution network and handles the data sources coming from various systems such as SCADA/DMS, AMR, GIS etc. Data coming from various sources get integrated into the Open DSO Technical Platform providing an adequate level of network observability. Low cost PMUs are deployed in Mesogia area in critical network points and nodes where there is limited observability or a requirement to have an increased awareness such as DER and prosumers bidirectional power flows. Also, PMU data are integrated in the DSO Technical Platform following a data collection plan that serves the functionalities of the flexibility tools and services. Measurements from PMUs enhance network awareness in terms of data granularity and number of nodes observed in a cost effective manner. Also, the open DSO Technical Platform performs the correlation of the data coming from different sources and systems during real time, providing to the DSO the technical capacity for flexibility mechanisms support and a User Interface (UI) where the aforementioned is visualised. All data is verified and secured by the use of blockchain technology to be developed in the Blockhain Access Platform of the project.
ID | Name | Description | Reference to mentioned use case objectives |
---|---|---|---|
add text | add text | add text | add text |
Notes: Can be left blank now
Assumptions | Prerequisites |
---|---|
PMUs are provided for deployment in Mesogia area |
Notes:
OPTIONAL - you can leave it blank
Relation to other use cases |
---|
Include all other uc-GR |
Level of depth |
generic |
Prioritisation |
add text |
Generic, regional or national relation |
add text |
Nature of the use cases |
add text |
Further keywords for classification |
technical (IT) |
Notes:
General remarks |
---|
- add text - add text - add text |
Notes: Add any remarks which do not fit in any other category
Actor Name | Actor Type | Actor Description | Further information specific to this Use Case |
---|---|---|---|
AMR | System | Automatic Meter Reading system | |
DMS | System | Distribution Management System | |
DSOTP | System | DSO Technical Platform | The system that integrates data from various DSO sources as well as the PMUs installed in Mesogia and allows use of tools and services developed within the roject |
DSO Data Server | System | Database containing data from AMR, DMS & SCADA | |
GIS | System | Geographical Information System | |
SCADA | Device | Supervisory Control And Data Acquisition system | |
BAP | System | Blockchain Access Platform |
Notes:
OPTIONAL - you can leave it blank
No. | References Type | Reference | Status | Impact on Use Case | Organistaor / Organisation | Link |
---|---|---|---|---|---|---|
add text | add text | add text | add text | add text | add text |
No. | Scenario Name | Primary Actor | Triggering Event | Pre-Condition | Post-Condition |
---|---|---|---|---|---|
1 | Data integration and visualisation in the DSOTP (User Interface) | none | none | none | Data from various data sources as well as services’ outcomes integrated and visualised in the DSOTP |
Notes This part describes the possible scenarios of the use case. The scenarios should comply with the sequence diagrams in Sect. 2 of the template, so that every step describes one part of a communication or action. Apart from a normal success scenario, different failure scenarios or alternatives can be included to describe situations where preconditions are not satisfied or unwanted states are attained.
Scenario Name: No. 1 - Data integration and visualisation in the DSOTP (User Interface)
Step No. | Event. | Name of Process/ Activity | Description of Process/ Activity. | Service | Information Producer (Actor) | Information Receiver (Actor) | Information Exchanged | Requirements, R-ID |
---|---|---|---|---|---|---|---|---|
1 | none-continuous process | Data Aquisition | Various field measurements that reflect the network state are communicated | REPORT | SCADA,DMS,GIS,AMR | DSO Data Server | I-01 | |
2 | none-continuous process | Data Aquisition | PMU data are retrieved by and integrated in the DSOTP | REPORT | PMUs | DSOTP | I-04 | |
3 | none-continuous process | Data Aquisition | Various field measurements that reflect the network state are communicated | REPORT | DSO Data Server | BAP | I-01 | |
4 | none-continuous process | Data Verification | All data received gets verified and secured via blockchain technology | EXECUTE | BAP | BAP | I-01 | |
5 | none-continuous process | Data Aquisition | Verified and secured data is delivered to the DSOTP | REPORT | BAP | DSOTP | I-01 | |
6 | none-continuous process | Data Visualisation | Data and services’ outcomes are visualised (User Interface) | EXECUTE | DSOTP | DSOTP | - |
Notes This part describes the possible scenarios of the use case. The scenarios should comply with the sequence diagrams in Sect. 2 of the template, so that every step describes one part of a communication or action. Apart from a normal success scenario, different failure scenarios or alternatives can be included to describe situations where preconditions are not satisfied or unwanted states are attained.
Information exchanged ID | Name of Information | Description of Information Exchanged | Protocol |
---|---|---|---|
I-01 | Measurements | Measurements from the Distribution Network (voltage magnitudes, active and reactive power injections/flows) | TCP/IP, IP over GPRS |
I-04 | PMU Measurements | Measurements from PMUs (e.g. voltage magnitudes, voltage phasors, current phasors) | MQTT |
Notes
Term | Definition |
---|---|
Key | Value | Refers to Section |
---|---|---|