Test Specification 18.02

Evaluating the provision of regulatory aggregator services under irregularities after network disruptions or errors in forecast/measurement

Test Rationale

This test investigates aggregator services that are involved in regulating the grid properties towards desired values in case of emerging deviations:

  • Coordinated voltage control
  • Fast frequency response
  • Virtual inertia provision

In the process, the individual activation patterns of the services undergo assessment. Simulation software provides the various auxiliary services required for their functionality:

  • Collection of updated capabilities from DERs
  • Evaluation of automatic restoration reserve provision by DERs, storage units and controllable loads
  • Computation of optimal and feasible P/Q set-point
  • Verification of actual P/Q produced and possible recalculation

ICT-related effects are abstracted as activation delays, making this an “idealized” case.

Specific Test System

This Test Specification requires a simulator of a grid (MV/LV distribution network or single LV distribution feeder) with several connected DERs / storage units.

Target measures

  • Safe and robust voltage for all nodes: Direct voltage operating regions not violated
  • Frequency restoration time: <120sec
  • Steady-state deviation: <0.1Hz
  • Reserves availability (power/energy): >20%
  • DERs curtailment: <30%
  • Loads curtailment: <5%

Input and output parameters

Uncontrollable input parameters:

  • Grid topology
  • Generation and load profiles
  • DER controllers parameters
  • Tie-line exchange specifications

Controllable input parameters:

  • Voltage set-point
  • Frequency set-point
  • Load value

Output parameters:

  • Node voltages
  • Power losses

Test Design

The test considers several consecutive imbalances and voltage/frequency deviations in order to sufficiently evaluate the capability of the voltage/frequency control system to cope with such incidents. The following border cases are defined:

  • Maximally decrease input voltage/frequency, use constant voltage/frequency set-point
  • Maximally increase input voltage/frequency, use constant voltage/frequency set-point
  • Decrease voltage/frequency set-point from maximal to minimal value, do not artificially vary input voltage/frequency
  • Increase voltage/frequency set-point from minimal to maximal value, do not artificially vary input voltage/frequency
  1. The operating set-points are determined.
  2. The output stabilizes.
  3. The input voltage/frequency and/or the set-points are varied according to the current border case.
  4. The test criteria are assessed.
  5. Steps 2-4 are repeated until the testing of each predefined border case was concluded.

Initial system state

Initial power flow conditions:

  • The voltage/frequency value (output) matches the voltage/frequency set-point.
  • The combination of the RES units should provide at least 20% of their nominal power.
  • The consumption of the loads should be at least 20% of the maximum consumption.
  • The imbalance should be under 5%.

Evolution of system state and test signals

  • At first, the system is sufficiently balanced with only a small amount of reserves (ideally zero) implemented and the voltage/frequency nominal.
  • An imbalance emerges which leads to a significant voltage/frequency deviation and the consequent activation of a large part of reserves after a simulated communication delay.
  • Consumption or production changes in order to reduce the variation.
  • Subsequent disturbances emerge either before or after the restoration of voltage/frequency to its nominal value.
  • Having started at Inp0, the voltage/frequency changes up to Val1, then down to Val2 etc. with varying step sizes (St1, St2, …). For example, changes to the frequency could occur with a fixed ramp rate and amplitude.
  • The test is successful if load voltage/frequency is always regulated within its operating interval [TOL-, TOL+].

Other parameters

N/A

Temporal resolution

The simulation is continuous, with time step sizes depending on the software experiment:

  • Time constants inside SuT in-between 50 μs and 5 s
  • Monitoring quantities with a maximum sampling time of 0.1 sec.
  • Internal time resolution of communication simulation

Source of uncertainty

  • Grid parameters variability (i.e. resistance/inductance ratio)
  • Timing deviations, communication delays
  • Consumers’ demand
  • Environmental conditions

Suspension criteria / Stopping criteria

  • Restoration and stabilization of regular network behavior and properties (according to power quality standard EN50160)
  • Passage of predetermined critical amount of time
  • Violation of quality attributes
  • Deviation from initial conditions during start

Mapping to Research Infrastructure

Last modified 09.03.2022