Experiment Specification TC12.TS01.ES01

Co-Simulation of Electric Boiler Activation for Excess Power Consumption with Proportional Controllers

Research Infrastructure

N/A

Experiment Realisation

The experiment is implemented as co-simulation using mosaik with a simulator synchronization step size of 15 minutes.

Experiment Setup

Dedicated simulation components are implemented as FMUs for Co-Simulation:

  • power system simulation: the power system is implemented as pandapower model, using consecutive power flow calculations to simulate the power system; the electric boilers are represented as PQ loads;
  • thermal network simulation: the local heating network and the electric boilers are modelled with Modelica and compiled with Dymola; this model includes the proportional controllers that actuate the boilers;

Experimental Design and Justification

Precision of equipment and measurement uncertainty

N/A

Storage of experiment data

The output from the individual simulation components is stored as time series data (HDF5 data format).

Last modified 09.03.2022